schedule for a previously rated tower controller.
FTM Chapters 10
and 11 do not apply. This is only a sample; ATC or facility chiefs
may develop their own schedules to meet local facility needs and
requirements. The schedule must, however, be kept within the maximum
facility rating time shown in AR 95-2.
Figure 1-4.
Facility Training Schedule Contents.
b. Chapter tests
do not have to be taken in sequence. However,
trainees should begin
training in the least complex control position.
As shown in Figure
1-5, they may take chapter tests and become
position qualified as
soon as they desire and their abilities allow.
9
AV1959